Concrete
From pre-pour checks and concrete delivery to curing, strength reports and final inspection.
Start with the work package, then follow the linked guides, blank inspection records and project requirements that make the plan usable. Every template is a starting point: confirm scope, references, acceptance criteria and responsibilities against approved project documents.
Open the free online ITP builder · See an illustrative worked example · Choose a file format
From pre-pour checks and concrete delivery to curing, strength reports and final inspection.
Materials, fabrication, welds, fasteners, coatings and erection. Select the work in your package.
Excavation, founding, fill placement, compaction testing, trench backfill and final survey.
Internal wet areas: substrate, junctions, membrane application, curing and pre-cover checks.
Ordinary low-voltage building work, with installation checks and blank verification records.
Water, sanitary and stormwater services, with separate test and pre-cover checks.
A deliberately bounded interface baseline for a project-defined road pavement package from released formation/subgrade through unbound base/subbase and the specified surfacing interface, test evidence, survey and handover. Use only when the actual contract defines these activities and documents their criteria. It is not a national roadworks specification. Excludes drainage, bridges, pavement design, traffic management design, geotechnical design and unselected stabilisation or concrete pavement systems.
Building automatic sprinkler distribution/range pipe installation only, based on an identified approved design and project-adopted system standard. Covers material/route/support/joint/penetration coordination and receipt/review of a project-required test report from the assigned testing/commissioning party. Excludes fire hydrants, hose reels, alarms/detection, pumpsets, special hazards, domestic-system design, head fit-off unless expressly shown, pressure/functional test instructions, commissioning execution and statutory certification.
Ordinary building ductwork installation from approved layout through supports, duct assembly, insulation, terminal devices and handover of project-required inspection/test evidence. Excludes refrigeration circuits, refrigerant handling, equipment electrical work, system design, airflow balancing, test execution, commissioning, controls integration and building performance certification.
Metal roof sheet installation on a building roof, including scope/design release, material handling, support readiness, sheet installation, cut edges, flashings and weathering interface, closeout evidence. Excludes roof tiles/slate, roof drainage design/system, structural design, solar equipment, waterproofing membranes and specialist roof-access design.
Ordinary building decorative painting to scheduled interior/exterior building surfaces, including substrate review, preparation, approved primer/coating system, application, finish review, protection and handover. Excludes industrial/protective coating systems, specialist fireproofing, lead/asbestos remediation, structural repairs and coating design.
Ordinary internal ceramic/porcelain wall and floor tiling within a building, including substrate/readiness handoff, set-out, adhesive fixing, grout, movement/junction interfaces and closeout. Waterproofing design/installation/certification, stone, external facades, pools, structural substrate repair, wet-area compliance pathway selection and project-specific numerical tolerances are excluded or treated as interfaces.
An empty planning structure for a user-defined package. No trade inspection sequence is supplied. Replace the first placeholder row and add your own stages, methods, project criteria, roles and evidence links. Use a scoped trade template if you need candidate inspection coverage.
Use the online ITP builder · Compare Excel, Word and PDF formats · Review an illustrative worked example
Choose the record for the stage you are checking. Each has a different inspection scope and blank fields for project requirements, actual observations and follow-up.
Use the free templates and blank records as a starting point. When you have drawings, specifications or a required contractor form, choose a work type to see its scope and required inputs before ordering.
Templates provide editable inspection steps and prompts with corresponding blank site records. They do not contain project-specific engineering acceptance values, completed inspection results, approvals or signatures. Use the project documents to establish the requirements and complete records only when checks are performed on site.
Read how these resources are prepared, checked and kept within their source limits.