Free construction resources

Free Australian ITP templates and field records

Start with the work package, then follow the linked guides, blank inspection records and project requirements that make the plan usable. Every template is a starting point: confirm scope, references, acceptance criteria and responsibilities against approved project documents.

26 template and editor choices · 6 core trades · 19 scoped packages · Blank custom modeExcel · Word · PDFMatching blank field records

Open the free online ITP builder · See an illustrative worked example · Choose a file format

Browse free templates by work package

Six core trade templates lead to 13 scoped extensions. Six dedicated packages and a blank custom plan cover the remaining starting points.
CON15 inspection steps

Concrete

From pre-pour checks and concrete delivery to curing, strength reports and final inspection.

STL16 inspection steps

Structural steel

Materials, fabrication, welds, fasteners, coatings and erection. Select the work in your package.

EAR15 inspection steps

Earthworks & excavation

Excavation, founding, fill placement, compaction testing, trench backfill and final survey.

WPF17 inspection steps

Wet-area waterproofing

Internal wet areas: substrate, junctions, membrane application, curing and pre-cover checks.

ELE17 inspection steps

Electrical installation

Ordinary low-voltage building work, with installation checks and blank verification records.

PLB19 inspection steps

Plumbing & drainage

Water, sanitary and stormwater services, with separate test and pre-cover checks.

Dedicated work packages

RDW9 inspection steps

Road pavement construction

A deliberately bounded interface baseline for a project-defined road pavement package from released formation/subgrade through unbound base/subbase and the specified surfacing interface, test evidence, survey and handover. Use only when the actual contract defines these activities and documents their criteria. It is not a national roadworks specification. Excludes drainage, bridges, pavement design, traffic management design, geotechnical design and unselected stabilisation or concrete pavement systems.

FPR9 inspection steps

Sprinkler pipe installation

Building automatic sprinkler distribution/range pipe installation only, based on an identified approved design and project-adopted system standard. Covers material/route/support/joint/penetration coordination and receipt/review of a project-required test report from the assigned testing/commissioning party. Excludes fire hydrants, hose reels, alarms/detection, pumpsets, special hazards, domestic-system design, head fit-off unless expressly shown, pressure/functional test instructions, commissioning execution and statutory certification.

HVA9 inspection steps

HVAC ductwork installation

Ordinary building ductwork installation from approved layout through supports, duct assembly, insulation, terminal devices and handover of project-required inspection/test evidence. Excludes refrigeration circuits, refrigerant handling, equipment electrical work, system design, airflow balancing, test execution, commissioning, controls integration and building performance certification.

ROF9 inspection steps

Metal roofing installation

Metal roof sheet installation on a building roof, including scope/design release, material handling, support readiness, sheet installation, cut edges, flashings and weathering interface, closeout evidence. Excludes roof tiles/slate, roof drainage design/system, structural design, solar equipment, waterproofing membranes and specialist roof-access design.

PNT9 inspection steps

Architectural painting

Ordinary building decorative painting to scheduled interior/exterior building surfaces, including substrate review, preparation, approved primer/coating system, application, finish review, protection and handover. Excludes industrial/protective coating systems, specialist fireproofing, lead/asbestos remediation, structural repairs and coating design.

TIL9 inspection steps

Internal wall and floor tiling

Ordinary internal ceramic/porcelain wall and floor tiling within a building, including substrate/readiness handoff, set-out, adhesive fixing, grout, movement/junction interfaces and closeout. Waterproofing design/installation/certification, stone, external facades, pools, structural substrate repair, wet-area compliance pathway selection and project-specific numerical tolerances are excluded or treated as interfaces.

Blank ITP · Blank custom mode

An empty planning structure for a user-defined package. No trade inspection sequence is supplied. Replace the first placeholder row and add your own stages, methods, project criteria, roles and evidence links. Use a scoped trade template if you need candidate inspection coverage.

Open blank ITP

Guides for the job you need to do

From understanding control points to preparing records and closing out evidence.

Understand ITPs

Control points and acceptance

Project documents and approvals

Field evidence and closeout

Regional applicability

Trade-specific preparation

Road construction tasks

Building installation tasks

Project-specific ITP drafting

USD 99 per defined work package · within 24 hours after payment and required files are complete.

Use the free templates and blank records as a starting point. When you have drawings, specifications or a required contractor form, choose a work type to see its scope and required inputs before ordering.

Send project documents for drafting

What the free resources include

Templates provide editable inspection steps and prompts with corresponding blank site records. They do not contain project-specific engineering acceptance values, completed inspection results, approvals or signatures. Use the project documents to establish the requirements and complete records only when checks are performed on site.

Read how these resources are prepared, checked and kept within their source limits.