Project-specific drafting

Project-specific structural steel ITP preparation

Have a steelwork package to submit? Send your structural and shop or erection drawings, specifications and contractor form. We connect the supplied requirements to the applicable shop or site sequence and blank records.

USD 99 per defined work package · Excel, Word and PDF · Within 24 hours after the required project files are complete

The work package we prepare

One defined structural steel fabrication or erection work package. Confirm the member/lot boundary and whether processing, welding, specified NDT, coating handoff, delivery, site connections, survey or handover are included. Combined shop/site scope needs an agreed package boundary.

Structural and connection design, detailing design, lifting design, temporary stability design, welding qualification, NDT performance, coating testing and site certification are performed by the project-appointed parties. An ITP does not authorise erection, remove restraints or accept structural changes.

Documents that make the plan specific

Upload the files as they are. You do not need to extract clauses or rewrite them into a brief. Include the mandatory contractor form if you have one.

Controlled steelwork drawings and member schedule
Identify structural, shop or erection drawings, connection details, member marks and revisions.
Steelwork specification and inspection basis
Supply the adopted standards/editions, category where specified, welding/bolting/coating criteria and applicable coverage.
Fabrication or erection procedures and interfaces
Provide applicable approved welding procedures, erection/temporary stability documents, subcontractor boundaries and dossier expectations.
Contractor quality requirements
Include required ITP/record forms, inspection roles and any contractual hold/witness notices and release arrangements.

How requirements become checks and records

The sequence below explains the document workflow. It contains no engineering thresholds or completed inspection results.

Work stageWhat the ITP resolvesWhat the blank record captures later
Incoming steel and fabricationMap physical identification to material evidence, processing and member marks.Keep certificate/lot and piece-mark references connected through the fabrication records.
Connections and specified inspectionUse the actual connection details, approved procedure and stated visual/NDT or bolting requirements.Record the joint/connection ID, actual observation, report and exception/recheck references.
Erection and handoverReference approved support/stability documents, survey criteria and the agreed completion boundary.Keep installed member marks, survey files, connection records and unresolved interface decisions traceable.

What you receive

If the documents are incomplete or conflict

For example, a member mark and material certificate may support a receiving check while an unspecified weld acceptance class or missing approved erection sequence remains an explicit project query. We do not infer bolt torque, NDT extent, survey tolerance or release authority from a public template.

Project document precedence and approved revisions control the plan. Drafting does not confer engineering approval, certify compliance or guarantee contractor acceptance.