Project-specific drafting

Project-specific roofing ITP preparation

Send the package scope, roof plans and details, approved product/system documents, support handovers and contractor form. We organise the documented installation and evidence sequence for the roof zones and interfaces.

USD 99 per defined work package · Excel, Word and PDF · First delivery within 24 hours after payment and receipt of complete required project files.

Weekends and public holidays included. Need it sooner? Contact us before ordering to confirm availability. 2 free revision rounds within 14 days of first delivery. Our errors are corrected free without using a round. Delivery, revisions and refunds.

The work package we prepare

One customer-defined roofing package built from controlled project sources. The public starting point is metal sheet roofing; the paid plan follows the documented roof system, materials, locations and interfaces, with criteria and responsibilities referenced to supplied sources.

The public baseline does not define tile/slate, membrane or other roofing-system criteria. We can scope those systems from their controlling project documents. We do not design, install, test, inspect or certify the roof; structural, access and drainage design remain with assigned professionals.

Documents that make the plan specific

Upload the files as they are. You do not need to extract clauses or rewrite them into a brief. Include the mandatory contractor form if you have one.

Roof plans, sections and details
Identify roof zones, falls as designed, supports, penetrations, edges, interfaces, drawing revisions and approved changes.
Approved roofing product/system documents
Provide sheet profiles, fastener and flashing details, manufacturer instructions, finish requirements and approved product substitutions.
Receiving support and interface records
Include support/structure release, trade interfaces, weathering details and responsibility for penetrations and drainage connections.
Contractor form and closeout requirements
Supply required inspection format, roles, notices, defect process, protection and handover/as-built evidence.

How requirements become checks and records

The sequence below explains the document workflow. It contains no engineering thresholds or completed inspection results.

Work stageWhat the ITP resolvesWhat the blank record captures later
Support release and incoming materialsMap roof zones to support handover, approved details and material identification.Capture zone, support release/source revision, product IDs, damage/condition and unresolved interfaces.
Sheets, fasteners and flashingsConnect installation sequence to approved details and product instructions.Record installed area, product/batch where required, detail revision, specified checks, photos and issues.
Penetrations, weathering and closeoutLink each penetration/edge interface to its responsible trade and documented completion requirement.Capture interface owner, observations, repair/recheck evidence, protection and handover references.

What you receive

If the documents are incomplete or conflict

For example, a roof plan may identify zones while approved fixing details or penetration responsibilities are absent. We record the gap without inventing fastener spacing, weather limits, drainage capacity or acceptance criteria.

Review the draft against your project details before submission. Owner or head-contractor acceptance follows their project requirements and review process; feedback within the agreed scope can be addressed through the included revisions.

Related free records and guides

Start with your actual scope

Tell us the element, room group, work area or package boundary and upload the drawings, specification, product documents and required form as available. Questions can go to itp@cavoren.net.

Prepare my Roofing ITP