Australian construction · Project-specific drafting

A project-specific ITP, built from your files.

Send your drawings, specifications and contractor requirements. We organize only the information in your project files into an inspection plan and matching blank site records, and flag missing design values for confirmation.

USD 99one work package

First delivery within 24 hoursafter payment and complete project files · weekends and public holidays included

XLSX · DOCX · PDFeditable files + review copy + blank records

Start an order

THE DELIVERABLE

Your project information, organized for inspection.

Open the full worked example
WORKED EXAMPLE · WATERPROOFING

Inspection & test plan

FOR REVIEW · REV 00
Project Example bathroom refurbishmentLocation NSWWork package Bathroom floor & shower walls
Worked example inspection plan excerpt; actual site results are blank.
REFINSPECTION POINTREQUIREMENT / METHODACCEPTANCE CONDITIONRECORDRESULT
WP01Confirm work packageCompare marked work areas with scope before starting.Floor and shower wall extents match the example drawing.Marked extent checklist
WP03Review substrateInspect preparation and check readiness against the selected system instructions.Product-specific criteria are recorded from the supplied instructions.Substrate readiness record
WP04Check interfacesInspect wall–floor junctions, doorway threshold and service penetrations before coating.Each identified interface is accounted for against Detail D2 and system instructions.Inspection and photo references

Swipe or scroll sideways to view all plan columns.

Inspection methods, acceptance conditions and matching records in one plan.Site results and sign-off fields remain blank.

SELECT A WORK TYPE

One defined work package.

ITP drafting is available across construction trades. Choose the work type or Other, and define one package from your project files.

WHAT TO SEND

Start with the files you have.

Upload the project bundle as it is, including ZIP files.

  • Drawings and scope details
  • Specifications and product instructions
  • Head-contractor requirements
  • Required Excel or Word forms

If essential information is missing, we’ll identify it through your private order link.

Add project details

Your order stays private. Use the link in your confirmation email to check progress, send a message and download the completed files.

Open My orders

HELP BEFORE YOU ORDER

Common questions

Need to check your scope? itp@cavoren.net

What does one work package cover?

One defined scope in a selected work type. If your project includes several trades or the scope is unclear, contact us before ordering.

Can you use the head contractor’s form?

Yes. Attach their Excel or Word form with your project documents.

Can I submit the ITP to the owner or head contractor?

Your draft is prepared for project review and submission. Check the project details and items marked for confirmation first; final acceptance follows the owner or head contractor’s project requirements and review. Feedback within the agreed scope can be addressed through the included revisions.

When does the 24-hour delivery period start?

It starts after payment and receipt of the complete project files. Weekends and public holidays are included; please contact us in advance if you need an urgent delivery. If we need a clarification, we’ll message you through your private order link.

Can I request changes after delivery?

Yes. You can request two rounds of changes to the agreed work package within 14 calendar days of first delivery. We correct our own errors at no charge and they do not count toward those rounds. See the service policy.

Can I cancel or request a refund?

You can cancel for a full refund before drafting starts. If work has begun or there is a problem with the delivery, contact us so we can resolve it under the cancellation and refund policy.

How are my project files handled?

We use your project documents to prepare your package. During review and requested changes, we retain the files needed to complete that work; after your final acceptance, uploaded project documents and supplied forms are removed from project storage within 24 hours. File handling details.