Project-specific drafting

Project-specific painting and coatings ITP preparation

Send the package scope, surface schedule, approved coating system, substrate records, specification and contractor form. We organise documented preparation, application, inspection and handover requirements by area and system.

USD 99 per defined work package · Excel, Word and PDF · Within 24 hours after payment and the required project files are complete and usable

The work package we prepare

One customer-defined painting or coating package based on controlled project sources. The public starting point is ordinary architectural painting; the paid plan follows the specified system and surfaces, including other documented coating systems and interfaces when criteria and responsibilities are supplied.

The public baseline does not define industrial/protective coating, fireproofing, remediation or repair criteria. These and other customer-defined systems require their controlling project documents. We draft plans and records; we do not design coating systems or perform preparation, application, testing, inspection, remediation or certification.

Documents that make the plan specific

Upload the files as they are. You do not need to extract clauses or rewrite them into a brief. Include the mandatory contractor form if you have one.

Surface/room schedule and drawings
Identify substrate types, areas, elevations, exposure/finish zones, boundaries and revisions.
Coating schedule and approved system documents
Provide primer and finish product instructions, specified preparation, application conditions and project acceptance requirements.
Substrate and environmental records
Include substrate handovers and any project-required condition or environmental monitoring method and criteria.
Contractor form and quality interfaces
Provide inspection responsibilities, sample/mock-up approvals if specified, notice points, defect/recoat process and handover requirements.

How requirements become checks and records

The sequence below explains the document workflow. It contains no engineering thresholds or completed inspection results.

Work stageWhat the ITP resolvesWhat the blank record captures later
Substrate acceptance and preparationConnect each scheduled surface and handover to the specified preparation and readiness requirements.Capture area/substrate, source revisions, incoming condition, preparation evidence and open defects.
Coating application by system and areaMap approved products and application sequence to identified areas and project controls.Record product/batch, area, dates, specified measurements or conditions, observations and linked evidence.
Finish review and protectionTie the specified finish and protection requirements to completion and handover.Record inspected area, actual observations, defects/rework/recheck, protection and closeout references.

What you receive

If the documents are incomplete or conflict

For example, a surface schedule can define included rooms while the approved coating build-up or substrate acceptance is missing. We identify the exact gap and do not invent film thickness, environmental limits, preparation grades or acceptance criteria.

Project document precedence and approved revisions control the plan. Drafting does not confer engineering approval, certify compliance or guarantee contractor acceptance.

Related free records and guides

Start with your actual scope

Tell us the element, room group, work area or package boundary and upload the drawings, specification, product documents and required form as available. Questions can go to itp@cavoren.net.

Prepare my Painting & coatings ITP