PLB · Free editable resource

Plumbing and drainage inspection and test plan

Water, sanitary and stormwater services, with separate test and pre-cover checks.

Scope and limitations

Separate the work package into water, sanitary drainage and stormwater activities as relevant, including concealed work and required tests.

Use approved drawings, product instructions, project specifications and authority requirements to establish the actual test method and acceptance criteria.

Inspection steps in this starting template

  • Scope and service classification — Identify each system/medium, boundaries and excluded work.

    Review plans, scope, schedules and design notes; classify water, sanitary, stormwater and heated-water systems separately.

  • Regulatory basis and approvals — Confirm jurisdiction, applicable NCC Volume Three edition/state variations, licensing and inspection/notification pathway.

    Review regulatory authority guidance, approvals, project specification and adopted document register.

  • Material and product approval — Check pipe/fitting material, class/type, joint system, potable water suitability and product certification where applicable.

    Inspect labels/certificates and compare with approved submittal/specification and applicable WaterMark requirements.

  • Delivery and storage — Inspect received materials for identity, damage, cleanliness, contamination and storage protection.

    Visual inspection and trace labels/batches against product submittal; maintain caps/protection as required.

  • Set-out and service coordination — Check service route, levels, fixture/equipment connections, penetrations and clashes.

    Compare marked-out installation to coordinated drawings and surveyed levels; resolve clashes before fixing/covering.

  • Trench, bedding and support — For buried runs, check trench condition, bedding, support, depth/cover and protection; for above-ground, check supports and movement provisions.

    Inspect before laying and before cover; measure against approved details and the relevant adopted standard/project criteria.

  • Pipework installation and identification — Inspect pipe type/diameter, route, gradient where relevant, jointing, supports, isolation/access and identification.

    Visual and measured checks against isometrics, schedule, manufacturer jointing instructions and adopted standard.

  • Jointing and workmanship — Check joint preparation, assembly, welding/brazing/solvent process only for the specified material/system.

    Observe installer qualification where specified; check process parameters and joint records required by product/project instructions.

  • Valves, fixtures and backflow interfaces — Verify valve type/location/access, fixture connections, backflow device and cross-connection protections if in scope.

    Compare to approved schedules and NCC/project hazard assessment; record device identification and certificates where required.

  • Sanitary drainage alignment and falls — Inspect sanitary drain route, grade, connections, access openings and cleanouts before backfill.

    Check against approved drainage plan and levels; use survey/measurement method specified by project.

  • Sanitary pipe test before backfill — For sanitary plumbing/drainage, perform only the applicable jurisdiction/project test before concealment.

    Licensed plumber/drainer confirms adopted standard edition, system boundaries, test medium, pressure/head and duration; record results.

  • Water service pressure/leak test — Test water services using the method and criteria approved for the project and jurisdiction.

    Licensed plumber confirms isolated section, test medium, pressure/duration and acceptance source; record actual readings, instrument and observations.

  • Stormwater drainage (conditional) — Where included, check stormwater pipe, pits, inlets, gradients, connections and discharge points.

    Inspect route/levels and compare to approved stormwater plan, civil interface and applicable adopted requirements.

  • Heated water service (conditional) — Where included, check heater/system connections, relief/tempering components, discharge and access.

    Inspect against approved design, equipment instructions and adopted heated-water requirements.

  • Flushing, cleaning and disinfection (conditional) — Where required for drinking water, confirm flushing, disinfection and any specified water quality evidence.

    Follow project-approved procedure and applicable authority/manufacturer requirements; use competent authorised person.

  • Pre-cover inspection and backfill — Walk down installed services and confirm testing/photographs/authority inspections before covering.

    Check inspection checklist, test evidence, utility/authority notices, service marking and approved backfill requirements.

  • Commissioning and operational checks — Verify specified flow, operation, fixture discharge, leaks and system interfaces.

    Commission by licensed plumbing practitioner under approved procedure; record measured results and exceptions by system.

  • Defects and retest — Record leaks, blockages, incorrect levels, joint failures and corrective work.

    Identify location/system, defect, repair method, retest evidence and closure.

  • As-built and handover — Verify certificates, inspection notices, test reports, product evidence, as-builts and operation/maintenance information.

    Review contract/regulator handover index and match records to service IDs/locations.

How to complete the project fields

  1. Identify the actual work package and remove steps outside its scope.
  2. For each retained check, cite the current drawing, specification, product instruction or approved project document.
  3. Enter project acceptance requirements exactly from those sources and agree inspection responsibilities and release points.
  4. Keep measurements, observations, dates and signatures blank until checks are performed on site.

Source notes

The starting structure is a general planning aid. The links below explain topic context; they do not set universal project acceptance values.

Continue with the related work

Choose the next resource for your task.

Prepare this plan

Keep the work package, inspection sequence and record under the same project references.

Define criteria and control points

Resolve the project requirement, notice and release arrangements before site checks.

Capture and close out the evidence

These blank records support the relevant work stages; complete actual results on site.

Browse guides by task · Browse field and quality records

Browser editor

Loading the editable Plumbing & drainage plan… If the editor does not load, download a file above.

  • Scope and service classification — Identify each system/medium, boundaries and excluded work.

    Review plans, scope, schedules and design notes; classify water, sanitary, stormwater and heated-water systems separately.

  • Regulatory basis and approvals — Confirm jurisdiction, applicable NCC Volume Three edition/state variations, licensing and inspection/notification pathway.

    Review regulatory authority guidance, approvals, project specification and adopted document register.

  • Material and product approval — Check pipe/fitting material, class/type, joint system, potable water suitability and product certification where applicable.

    Inspect labels/certificates and compare with approved submittal/specification and applicable WaterMark requirements.

  • Delivery and storage — Inspect received materials for identity, damage, cleanliness, contamination and storage protection.

    Visual inspection and trace labels/batches against product submittal; maintain caps/protection as required.

  • Set-out and service coordination — Check service route, levels, fixture/equipment connections, penetrations and clashes.

    Compare marked-out installation to coordinated drawings and surveyed levels; resolve clashes before fixing/covering.

  • Trench, bedding and support — For buried runs, check trench condition, bedding, support, depth/cover and protection; for above-ground, check supports and movement provisions.

    Inspect before laying and before cover; measure against approved details and the relevant adopted standard/project criteria.

  • Pipework installation and identification — Inspect pipe type/diameter, route, gradient where relevant, jointing, supports, isolation/access and identification.

    Visual and measured checks against isometrics, schedule, manufacturer jointing instructions and adopted standard.

  • Jointing and workmanship — Check joint preparation, assembly, welding/brazing/solvent process only for the specified material/system.

    Observe installer qualification where specified; check process parameters and joint records required by product/project instructions.

  • Valves, fixtures and backflow interfaces — Verify valve type/location/access, fixture connections, backflow device and cross-connection protections if in scope.

    Compare to approved schedules and NCC/project hazard assessment; record device identification and certificates where required.

  • Sanitary drainage alignment and falls — Inspect sanitary drain route, grade, connections, access openings and cleanouts before backfill.

    Check against approved drainage plan and levels; use survey/measurement method specified by project.

  • Sanitary pipe test before backfill — For sanitary plumbing/drainage, perform only the applicable jurisdiction/project test before concealment.

    Licensed plumber/drainer confirms adopted standard edition, system boundaries, test medium, pressure/head and duration; record results.

  • Water service pressure/leak test — Test water services using the method and criteria approved for the project and jurisdiction.

    Licensed plumber confirms isolated section, test medium, pressure/duration and acceptance source; record actual readings, instrument and observations.

  • Stormwater drainage (conditional) — Where included, check stormwater pipe, pits, inlets, gradients, connections and discharge points.

    Inspect route/levels and compare to approved stormwater plan, civil interface and applicable adopted requirements.

  • Heated water service (conditional) — Where included, check heater/system connections, relief/tempering components, discharge and access.

    Inspect against approved design, equipment instructions and adopted heated-water requirements.

  • Flushing, cleaning and disinfection (conditional) — Where required for drinking water, confirm flushing, disinfection and any specified water quality evidence.

    Follow project-approved procedure and applicable authority/manufacturer requirements; use competent authorised person.

  • Pre-cover inspection and backfill — Walk down installed services and confirm testing/photographs/authority inspections before covering.

    Check inspection checklist, test evidence, utility/authority notices, service marking and approved backfill requirements.

  • Commissioning and operational checks — Verify specified flow, operation, fixture discharge, leaks and system interfaces.

    Commission by licensed plumbing practitioner under approved procedure; record measured results and exceptions by system.

  • Defects and retest — Record leaks, blockages, incorrect levels, joint failures and corrective work.

    Identify location/system, defect, repair method, retest evidence and closure.

  • As-built and handover — Verify certificates, inspection notices, test reports, product evidence, as-builts and operation/maintenance information.

    Review contract/regulator handover index and match records to service IDs/locations.