Project-specific drafting

Project-specific earthworks ITP preparation

Need an earthworks ITP that connects the work area to its survey, material and test evidence? Send the approved earthworks drawings, geotechnical requirements and contractor form. We organise the checks around the actual cut, fill or trench-backfill package and identify the decisions required before the next stage.

USD 99 per defined work package · Excel, Word and PDF · Within 24 hours after payment and the required project files are complete and usable

The work package we prepare

One identified package: bulk excavation and site cut/fill; selected fill placement and compaction; or ordinary utility trench bedding, surround and backfill. Define the area, level or chainage limits and who supplies each interface. A larger earthworks contract may require separately controlled plans for its different packages.

Customer-defined or wider earthworks work can be prepared when its scope and controlling project documents are supplied; the free baseline is narrower. Geotechnical investigation, design of foundations or retaining structures, trench-support design, excavation safety procedures, laboratory testing and site supervision remain with the responsible specialists. Preparing an ITP does not determine bearing capacity, certify soil suitability or authorise a utility pipe to be covered. Pipe installation and system tests remain separate where performed by another contractor.

Documents that make the plan specific

Upload the files as they are. You do not need to extract clauses or rewrite them into a brief. Include the mandatory contractor form if you have one.

Approved earthworks drawings and survey control
Cut/fill boundaries, design surfaces, formation levels, trench details, service interfaces and the actual survey datum, sheet numbers and revisions. Include approved changes and the required as-built information.
Geotechnical report and project specification
The applicable material/source criteria, founding or formation instructions, layer and conditioning requirements, compaction acceptance basis and any restrictions for the identified work area. A report for another site or soil type cannot supply the missing project values.
Inspection and test plan requirements
The lot and layer definitions, nominated methods, laboratory/report arrangements, sampling coverage and frequency, acceptance calculation where specified, and the process for failures, rework and retesting.
Work sequence, handover and contractor form
Identify the receiving-surface handover, services to protect, who installs the pipe, who reviews test evidence and any contractual notice or release rights. Include the mandatory form and relevant approved construction procedures.

How requirements become checks and records

The sequence below explains the document workflow. It contains no engineering thresholds or completed inspection results.

Work stageWhat the ITP resolvesWhat the blank record captures later
Excavation and formation handoverThe plan ties each work area to the approved surface or founding instruction, survey reference and the evidence needed before fill, bedding or follow-on construction. Changed or unsuitable conditions are referred through the project process.The blank record captures area/chainage, observed condition, level evidence, geotechnical instruction where applicable, unresolved issues and the actual handover decision.
Fill and compaction by lot and layerMaterial identity, placement and conditioning checks are separated from the specified compliance tests. The project defines the criteria, method, frequency and who reviews the evidence.Keep source/batch identity, receiving surface, layer limits, test locations and original laboratory report references linked. Record failures and rework against the same lot before linking any retest.
Trench bedding, surround and backfillThe plan coordinates formation, service support/protection, exposed-work inspection, staged backfill and reinstatement. Pipe tests and any pipe-contractor release are identified as incoming interface evidence.Record trench/run limits, detail revision, material and layer evidence, inspection before concealment, test/report links and the assigned covering or reinstatement decision.

What you receive

If the documents are incomplete or conflict

For example, a test report can identify a result without establishing that the relevant lot meets its specification. If the lot boundary, acceptance method, material requirement or review authority is missing, we identify that precise gap. We do not fill it with a generic compaction percentage, a test frequency taken from a road specification or an assumed geotechnical approval.

Project document precedence and approved revisions control the plan. Drafting does not confer engineering approval, certify compliance or guarantee contractor acceptance.