Project-specific drafting

Project-specific plumbing and drainage ITP preparation

Need an ITP for a building water service, sanitary drain run or site stormwater package? Send the approved drawings, specification, product instructions and contractor form. We organise the installation checks and required evidence around that defined scope.

USD 99 per defined work package · Excel, Word and PDF · Within 24 hours after the required project files are complete

The work package we prepare

One identified ordinary building water-services, sanitary-drainage or stormwater-drainage work package. The agreed boundary determines material checks, installation interfaces, pre-cover inspections, applicable testing and completion evidence. Separate systems and additional packages are scoped individually.

Gas, industrial/process pressure piping, fire services, authority networks, on-site wastewater treatment and hydraulic design require separate scope. Installation, testing, statutory inspection and certification remain with the appropriately appointed parties. Document preparation does not authorise connection or concealment.

Documents that make the plan specific

Upload the files as they are. You do not need to extract clauses or rewrite them into a brief. Include the mandatory contractor form if you have one.

Hydraulic or drainage drawings
Current revisions, pipe sections/runs and pit IDs, routes, levels, supports, connection details and the upstream/downstream scope boundary.
Specification and approved product instructions
Selected materials and joint systems, installation requirements and evidence of suitability or WaterMark applicability. Include approved substitutions.
Approved test and completion requirements
Applicable method, medium, pressure/head, duration, acceptance criteria, instrument evidence, coverage and any flushing/disinfection requirements. These are taken from project sources, not generic defaults.
Project and jurisdiction requirements
Location, adopted requirements, contractor form, assigned responsibilities, notices/hold points and applicable authority connection, inspection and certification arrangements.

How requirements become checks and records

The sequence below explains the document workflow. It contains no engineering thresholds or completed inspection results.

Work stageWhat the ITP resolvesWhat the blank record captures later
Water services installation and testingLink the selected products and installation section to approved jointing, routing and test requirements.Capture section limits, instruments and specified conditions, then actual test evidence, defects and retest references.
Sanitary work before coveringIdentify the run, relevant geometry/joints/access and applicable pre-cover inspection and test requirements.Keep observed installation evidence, test report and the project-assigned covering decision linked to the same run.
Stormwater pipes, pits and outletReference the approved layout, levels, designated outlet and relevant installation interfaces.Link pipe/pit observations, applicable tests, as-built details and unresolved connections to the handover.

What you receive

If the documents are incomplete or conflict

For example, an approved layout can support the installation sequence while a missing pressure-test procedure remains a specific query. We do not invent pressure, test duration, drainage gradient, disinfection conditions or authority release rights. Essential unresolved criteria must be confirmed before the affected check is finalised.

Project document precedence and approved revisions control the plan. Drafting does not confer engineering approval, certify compliance or guarantee contractor acceptance.

Related free records

Start with your actual scope

Tell us the element, room group, work area or package boundary and upload the drawings, specification, product documents and required form as available. Questions can go to itp@cavoren.net.

Prepare my plumbing and drainage ITP