The work package we prepare
One customer-defined tiling package built from controlled project documents. The public starting point is ordinary internal ceramic or porcelain wall and floor tiling; the paid plan follows the documented package, materials, locations and interfaces. Waterproofing design, installation and covering release remain with their assigned parties.
The paid package follows the scope and criteria in your supplied project documents, including a customer-defined system where documented. Public free baselines cover a narrower ordinary internal scope. We do not design substrates or waterproofing, perform installation or inspection, select an unprovided compliance pathway, or certify acceptance. Stone, external façades, pools and specialist systems need their own defined source documents and scope.
Documents that make the plan specific
Upload the files as they are. You do not need to extract clauses or rewrite them into a brief. Include the mandatory contractor form if you have one.
- Room schedule and controlled drawings
- Identify rooms/areas, wall and floor extents, setting-out, tile schedule, edges, openings, transitions and approved revisions.
- Substrate and waterproofing handover
- Provide substrate acceptance records, relevant wet-area details, waterproofing system documents and the assigned pre-cover/covering responsibilities.
- Specified tiles, adhesives, grout and movement details
- Supply approved product schedules and instructions, project criteria and any required samples/mock-up approvals. Do not rely on product names alone for criteria.
- Contractor form and inspection responsibilities
- Include the required ITP/record format, package boundaries, inspection roles, notices, defect/rework process and handover records.
How requirements become checks and records
The sequence below explains the document workflow. It contains no engineering thresholds or completed inspection results.
| Work stage | What the ITP resolves | What the blank record captures later |
|---|---|---|
| Room and substrate readiness | Map room IDs and the approved substrate/waterproofing handover to the work release checks. | Capture room, drawing revisions, incoming records, observed condition, open interfaces and assigned release reference. |
| Set-out and tile fixing | Tie the tile schedule, set-out details and approved installation/product requirements to the fixing sequence. | Record room/face, product/batch references where required, set-out evidence, installation observations, photos and issues. |
| Grout, movement interfaces and handover | Map specified grout/joint details, protection and completion criteria to the closeout sequence. | Capture completed area, applicable observations, defects/rechecks, protection status and handover evidence. |
What you receive
- A scoped Tiling ITP with inspection steps, methods, project criteria and source references, timing/frequency where supplied, responsibilities and the project control-point legend.
- Matching blank field records for the agreed checks, including actual observation, evidence, issue, recheck and sign-off fields.
- Excel, Word and PDF, with document control and specific open confirmations. Actual measurements, test results and signatures remain blank.
- Your supplied contractor form used where its format is required, with its required structure retained. Source documents and paid standards are not redistributed as part of the package.
If the documents are incomplete or conflict
For example, a room schedule may establish areas while approved adhesive instructions or the substrate handover is missing. We flag that input and leave unsupported criteria unresolved; we do not invent adhesive coverage, lippage limits, joint spacing or release rights.
Project document precedence and approved revisions control the plan. Drafting does not confer engineering approval, certify compliance or guarantee contractor acceptance.
Related free records and guides
- Internal wall and floor tiling plan
- Waterproofing before tiling record
- Wet-area waterproofing record
- Project-specific ITP guide
- Waterproofing ITP guide
- Construction Nonconformance Report and Corrective Action Record
- Construction ITP Inspection and Quality Records Register
- Quality Management Plan vs ITP for a Construction Work Package
- ITP Handover Dossier and Construction Quality Evidence Index
- Internal Wall and Floor Tiling ITP Preparation and Inspection Records
Start with your actual scope
Tell us the element, room group, work area or package boundary and upload the drawings, specification, product documents and required form as available. Questions can go to itp@cavoren.net.
Prepare my Tiling ITP