Project-specific drafting

Project-specific concrete ITP preparation

Have a slab, footing, column or wall package to submit? Send the structural drawings, specification and contractor requirements. We turn the supplied requirements into an inspection sequence and matching blank records for that package.

USD 99 per defined work package · Excel, Word and PDF · First delivery within 24 hours after payment and receipt of complete required project files.

Weekends and public holidays included. Need it sooner? Contact us before ordering to confirm availability. 2 free revision rounds within 14 days of first delivery. Our errors are corrected free without using a round. Delivery, revisions and refunds.

The work package we prepare

One identified cast-in-place slab, footing, column or wall package, from applicable preparation and pre-pour checks through concrete receipt, placement, curing, testing and closeout. We confirm which stages your scope includes before drafting.

Customer-defined or wider concrete work can be prepared when its package boundaries and project sources are supplied; the free baseline is narrower. Precast manufacture, prestressing, piles, shotcrete, specialist repair and temporary-works design need a separately defined source-backed scope. This service prepares documents; structural design, formwork design, laboratory testing and site inspection are performed by the project-appointed parties.

Documents that make the plan specific

Upload the files as they are. You do not need to extract clauses or rewrite them into a brief. Include the mandatory contractor form if you have one.

Structural drawings and bar schedules
Current revisions, element or pour boundaries, reinforcement details, cover requirements and relevant dimensions.
Concrete specification and approved mix information
The project strength, exposure, placement, curing and test requirements, with units and applicable exceptions.
Quality and inspection requirements
The contractor’s ITP form, lot/sample rules, laboratory arrangements, notice periods and any assigned hold or witness points.
Formwork and temporary-works documents, where applicable
The relevant design/check records and interfaces to be referenced; preparing an ITP does not replace those documents.

How requirements become checks and records

The sequence below explains the document workflow. It contains no engineering thresholds or completed inspection results.

Work stageWhat the ITP resolvesWhat the blank record captures later
Reinforcement before placementThe drawing and bar schedule identify what to check; the ITP identifies the method, responsible role and timing.Record the checked location, specified requirement, actual measurement or observation, drawing revision, evidence and any recheck.
Concrete receipt and testingThe project specification and approved mix documents define applicable receipt checks, sampling and acceptance.Keep delivery identification and applicable test/sample references linked to the element or pour.
Curing and closeoutThe supplied curing and testing requirements are assigned to their actual work stages.Keep method and timing records, test report references and disposition of unresolved items.

What you receive

If the documents are incomplete or conflict

For example, a missing reinforcement detail can be identified by drawing/element while the unambiguous receipt and curing stages are drafted. A missing essential criterion or conflicting revision still needs project clarification before the affected check can be finalised.

Review the draft against your project details before submission. Owner or head-contractor acceptance follows their project requirements and review process; feedback within the agreed scope can be addressed through the included revisions.

Related free records and guides

Start with your actual scope

Tell us the element, room group, work area or package boundary and upload the drawings, specification, product documents and required form as available. Questions can go to itp@cavoren.net.

Prepare my Concrete ITP