The work package we prepare
One identified cast-in-place slab, footing, column or wall package, from applicable preparation and pre-pour checks through concrete receipt, placement, curing, testing and closeout. We confirm which stages your scope includes before drafting.
Customer-defined or wider concrete work can be prepared when its package boundaries and project sources are supplied; the free baseline is narrower. Precast manufacture, prestressing, piles, shotcrete, specialist repair and temporary-works design need a separately defined source-backed scope. This service prepares documents; structural design, formwork design, laboratory testing and site inspection are performed by the project-appointed parties.
Documents that make the plan specific
Upload the files as they are. You do not need to extract clauses or rewrite them into a brief. Include the mandatory contractor form if you have one.
- Structural drawings and bar schedules
- Current revisions, element or pour boundaries, reinforcement details, cover requirements and relevant dimensions.
- Concrete specification and approved mix information
- The project strength, exposure, placement, curing and test requirements, with units and applicable exceptions.
- Quality and inspection requirements
- The contractor’s ITP form, lot/sample rules, laboratory arrangements, notice periods and any assigned hold or witness points.
- Formwork and temporary-works documents, where applicable
- The relevant design/check records and interfaces to be referenced; preparing an ITP does not replace those documents.
How requirements become checks and records
The sequence below explains the document workflow. It contains no engineering thresholds or completed inspection results.
| Work stage | What the ITP resolves | What the blank record captures later |
|---|---|---|
| Reinforcement before placement | The drawing and bar schedule identify what to check; the ITP identifies the method, responsible role and timing. | Record the checked location, specified requirement, actual measurement or observation, drawing revision, evidence and any recheck. |
| Concrete receipt and testing | The project specification and approved mix documents define applicable receipt checks, sampling and acceptance. | Keep delivery identification and applicable test/sample references linked to the element or pour. |
| Curing and closeout | The supplied curing and testing requirements are assigned to their actual work stages. | Keep method and timing records, test report references and disposition of unresolved items. |
What you receive
- A scoped Concrete ITP with inspection steps, methods, project criteria and source references, timing/frequency where supplied, responsibilities and the project control-point legend.
- Matching blank field records for the agreed checks, including actual observation, evidence, issue, recheck and sign-off fields.
- Excel, Word and PDF, with document control and specific open confirmations. Actual measurements, test results and signatures remain blank.
- Your supplied contractor form used where its format is required, with its required structure retained. Source documents and paid standards are not redistributed as part of the package.
If the documents are incomplete or conflict
For example, a missing reinforcement detail can be identified by drawing/element while the unambiguous receipt and curing stages are drafted. A missing essential criterion or conflicting revision still needs project clarification before the affected check can be finalised.
Review the draft against your project details before submission. Owner or head-contractor acceptance follows their project requirements and review process; feedback within the agreed scope can be addressed through the included revisions.
Related free records and guides
- Concrete template
- Concrete columns and walls plan
- Reinforcement inspection
- Formwork inspection
- Pre-pour inspection
- Concrete delivery and receipt record
- Concrete testing and sample traceability
- Concrete curing and protection record
- Writing a concrete ITP
- ITP versus field checklist
- Construction Nonconformance Report and Corrective Action Record
- Construction ITP Inspection and Quality Records Register
- Concrete slab plan
- Concrete footings plan
- Concrete Pour Lot Evidence Dossier: Link the Plan, Delivery, Tests and Closeout
- Quality Management Plan vs ITP for a Construction Work Package
- ITP Handover Dossier and Construction Quality Evidence Index
Start with your actual scope
Tell us the element, room group, work area or package boundary and upload the drawings, specification, product documents and required form as available. Questions can go to itp@cavoren.net.