The work package we prepare
One identified internal wet-area waterproofing package: applicable substrate preparation and handover, junction and penetration details, system installation records, curing/readiness evidence and inspection before protection or covering.
Customer-defined systems and wider waterproofing packages can be prepared when their boundaries and controlling project documents are supplied; the free baseline covers a narrower internal wet-area package. External decks, roofs, pools, tanks and below-ground systems need their own defined sources. This service does not carry out design, installation, testing, inspection or certification. Applicable building requirements and approval pathways remain project- and location-specific.
Documents that make the plan specific
Upload the files as they are. You do not need to extract clauses or rewrite them into a brief. Include the mandatory contractor form if you have one.
- Wet-area drawings and approved details
- Room boundaries, substrates, falls, drains, junctions, penetrations and the intended finish or covering.
- Specified system and product instructions
- The approved primer, membrane, bond breakers, reinforcement/accessories and current applicable instructions, including compatible substrates and installation conditions.
- Project specification and applicable compliance basis
- The project location, building class and adopted requirements where provided. A public example or the latest document online is not automatically the governing project edition.
- Contractor inspection and handover requirements
- The required form, responsible parties, assigned notice/hold points, testing instructions if applicable, and records needed before covering.
How requirements become checks and records
The sequence below explains the document workflow. It contains no engineering thresholds or completed inspection results.
| Work stage | What the ITP resolves | What the blank record captures later |
|---|---|---|
| Substrate handover | The specified system and project details define the substrate condition and interfaces to verify. | Record the inspected room/area, condition or measurements, preparation and unresolved defects before membrane work. |
| Membrane installation | Approved system instructions define the actual materials, preparation, application and applicable measurements. | Record products and batch references, work areas, application dates and required layer/measurement evidence. |
| Before covering | Project instructions define the readiness evidence, inspections and any specified testing. | Link installation and curing records to visible condition, damage/repair rechecks and the project handover decision. |
What you receive
- A scoped Waterproofing ITP with inspection steps, methods, project criteria and source references, timing/frequency where supplied, responsibilities and the project control-point legend.
- Matching blank field records for the agreed checks, including actual observation, evidence, issue, recheck and sign-off fields.
- Excel, Word and PDF, with document control and specific open confirmations. Actual measurements, test results and signatures remain blank.
- Your supplied contractor form used where its format is required, with its required structure retained. Source documents and paid standards are not redistributed as part of the package.
If the documents are incomplete or conflict
For example, a product name without the applicable system instructions is not enough to invent a membrane thickness, substrate moisture limit, curing period or flood-test duration. We identify the exact missing requirement and carry forward the supported parts of the package.
Review the draft against your project details before submission. Owner or head-contractor acceptance follows their project requirements and review process; feedback within the agreed scope can be addressed through the included revisions.
Related free records and guides
- Wet-area template
- Waterproofing substrate handover
- Wet-area waterproofing installation record
- Waterproofing before tiling
- Illustrative worked waterproofing example
- Wet Area Flood Test Record
- Waterproofing Repair and Recheck Record
- Construction Nonconformance Report and Corrective Action Record
- Construction ITP Inspection and Quality Records Register
- How to Write a Waterproofing ITP for Wet Areas
- Quality Management Plan vs ITP for a Construction Work Package
- ITP Handover Dossier and Construction Quality Evidence Index
- Liquid-Applied Exposed Roof Waterproofing ITP: System Selection and Zone Records
Start with your actual scope
Tell us the element, room group, work area or package boundary and upload the drawings, specification, product documents and required form as available. Questions can go to itp@cavoren.net.
Prepare my Waterproofing ITP