Project-specific drafting

Project-specific wet-area waterproofing ITP preparation

Need an ITP for an internal bathroom or wet-area package? Send the wet-area details, specified membrane system and contractor requirements. We organise the substrate handover, installation and pre-cover checks around those documents.

USD 99 per defined work package · Excel, Word and PDF · Within 24 hours after the required project files are complete

The work package we prepare

One identified internal wet-area waterproofing package: applicable substrate preparation and handover, junction and penetration details, system installation records, curing/readiness evidence and inspection before protection or covering.

External decks, roofs, pools, tanks, below-ground waterproofing and structural design are separate scopes. This service does not carry out installation, testing, inspection or certification. Applicable building requirements and approval pathways remain project- and location-specific.

Documents that make the plan specific

Upload the files as they are. You do not need to extract clauses or rewrite them into a brief. Include the mandatory contractor form if you have one.

Wet-area drawings and approved details
Room boundaries, substrates, falls, drains, junctions, penetrations and the intended finish or covering.
Specified system and product instructions
The approved primer, membrane, bond breakers, reinforcement/accessories and current applicable instructions, including compatible substrates and installation conditions.
Project specification and applicable compliance basis
The project location, building class and adopted requirements where provided. A public example or the latest document online is not automatically the governing project edition.
Contractor inspection and handover requirements
The required form, responsible parties, assigned notice/hold points, testing instructions if applicable, and records needed before covering.

How requirements become checks and records

The sequence below explains the document workflow. It contains no engineering thresholds or completed inspection results.

Work stageWhat the ITP resolvesWhat the blank record captures later
Substrate handoverThe specified system and project details define the substrate condition and interfaces to verify.Record the inspected room/area, condition or measurements, preparation and unresolved defects before membrane work.
Membrane installationApproved system instructions define the actual materials, preparation, application and applicable measurements.Record products and batch references, work areas, application dates and required layer/measurement evidence.
Before coveringProject instructions define the readiness evidence, inspections and any specified testing.Link installation and curing records to visible condition, damage/repair rechecks and the project handover decision.

What you receive

If the documents are incomplete or conflict

For example, a product name without the applicable system instructions is not enough to invent a membrane thickness, substrate moisture limit, curing period or flood-test duration. We identify the exact missing requirement and carry forward the supported parts of the package.

Project document precedence and approved revisions control the plan. Drafting does not confer engineering approval, certify compliance or guarantee contractor acceptance.

Related free records

Start with your actual scope

Tell us the element, room group or work boundary and upload the drawings, specification, product documents and required form as available. Questions can go to itp@cavoren.net.

Prepare my wet-area ITP