What this plan covers
A deliberately bounded interface baseline for a project-defined road pavement package from released formation/subgrade through unbound base/subbase and the specified surfacing interface, test evidence, survey and handover. Use only when the actual contract defines these activities and documents their criteria. It is not a national roadworks specification. Excludes drainage, bridges, pavement design, traffic management design, geotechnical design and unselected stabilisation or concrete pavement systems.
This free editable file is a scoped starting baseline, with proposed checks and matching blank record forms. It is not adopted project criteria. A separate paid project-specific ITP and matching blank records are available for this road pavement package; customer-controlled documents may define work beyond this baseline. Customer-controlled scope may include additional pavement systems or project interfaces beyond this baseline. Confirm the actual scope, materials, criteria, inspection roles and interfaces from approved project sources. Results and signatures remain blank until work is performed.
Project-specific ITP drafting for this package
The paid road pavement plan can distinguish formation handover, unbound layer placement, survey, specified material testing, surfacing interfaces and closeout by chainage, lane and lot. It does not supply a national road specification or add drainage, stabilisation or concrete pavement work unless included in the order scope.
Useful files to provide
- Approved pavement design, chainage / lane extents and layer schedule
- Adopted road authority specifications and project annexures
- Approved material sources, mix / product submissions and construction methods
- Lotting, survey, test coverage, traffic-stage and interface responsibilities
Example of an input still needed
For example: “The pavement drawings are attached, but the authority specification annexure and testing-lot definition are missing. Please provide the contract edition and project lot / test schedule.”
A project-specific road pavement construction ITP service prepares the plan and matching blank site records for this package. The listed inputs help scope the work; if an item is unavailable, it can be recorded as an open project decision rather than guessed.
How the plan and blank records fit together
The Excel, Word and PDF downloads each contain the plan and corresponding blank record forms. For this package, entries such as Chainage / lane / lot, Base / subbase layer ID, Adopted specs / annexure list provide examples of location, source / product and observation or traceability fields. They are fields in the downloadable package files, not separate online records; the browser editor edits the plan only.
Define the package before tailoring it
- Work areas and package boundary
- Identify room/zone/location limits, drawing references, interfaces and exclusions.
- Design and acceptance basis
- Identify project drawings, specifications, product/system selection and the person who resolves gaps.
- Materials and approved products
- Identify product/system approval, delivery traceability and applicable installation instructions.
- Inspection, verification and reporting basis
- Copy the project method, acceptance source, trigger/frequency, role and record requirement; do not infer values.
- Roles and external controls
- Identify performer/reviewer, contractual notices, Hold/Witness points and release authority from project records.
- Handover evidence
- Identify location/as-built, photo, certificate, defect/disposition and submission requirements.
Inspection sequence and project requirements
This starting plan contains 9 inspection steps. Proposed timing and roles need project confirmation; no contractual hold point or engineering acceptance value is assigned by this template. Actual results and signatures remain blank.
ROA-01 · Contract, road chainage and pavement scope release
- Work stage
- Contract, road chainage and pavement scope release
- Inspection / test
- Confirm contract jurisdiction/client, work limits, chainage/lanes, pavement design, selected layers and adopted specification editions.
- Method
- Review contract, drawings, pavement schedule, annexures, hold/witness schedule and project quality plan; map each activity to its governing clause.
- Acceptance condition
- Project source and approved installation details identify the applicable scope, requirements and evidence for this location; record any gap or variance for assigned disposition. [Fill: Assigned performer, reviewer and external control roles] [Fill: Project inspection/testing plan and acceptance basis] [Fill: Project records and handover submission rules]
- Timing / coverage
- At the work stage identified by the project inspection plan; repeat when the applicable location, installation condition or controlled source changes. [Fill: Project inspection/testing plan and acceptance basis]
- Responsible role
- Proposed: assigned trade supervisor / quality role records the check; review and external sign-off remain with project-assigned persons acting within documented authority. [Fill: Assigned performer, reviewer and external control roles]
- Control / release arrangement
- Proposed internal readiness prompt only. Verify contractual notice, Hold/Witness point, release evidence and authority in project documents; this template assigns none. [Fill: Assigned performer, reviewer and external control roles]
- Record
- Road pavement scope and source register
- Project document reference
- For this row, record the exact project document/revision/clause, drawing/sheet/detail or product instruction supporting: Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules. Identify missing or conflicting sources for disposition. Topic references do not establish project adoption.
- Project inputs to resolve
- Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules
- Blank record fields
- Contract / jurisdiction; Chainage / lane / limits; Pavement layer schedule ref.; Adopted specs / annexure list
ROA-02 · Survey control, set-out and services/interface readiness
- Work stage
- Survey control, set-out and services/interface readiness
- Inspection / test
- Verify current survey controls, pavement geometry, drainage/utility interfaces and cleared work-front boundaries are identified.
- Method
- Check approved setting-out and interface records against drawings, survey control documentation and permit/traffic staging requirements.
- Acceptance condition
- Project source and approved installation details identify the applicable scope, requirements and evidence for this location; record any gap or variance for assigned disposition. [Fill: Assigned performer, reviewer and external control roles] [Fill: Project inspection/testing plan and acceptance basis] [Fill: Project records and handover submission rules]
- Timing / coverage
- At the work stage identified by the project inspection plan; repeat when the applicable location, installation condition or controlled source changes. [Fill: Project inspection/testing plan and acceptance basis]
- Responsible role
- Proposed: assigned trade supervisor / quality role records the check; review and external sign-off remain with project-assigned persons acting within documented authority. [Fill: Assigned performer, reviewer and external control roles]
- Control / release arrangement
- Proposed internal readiness prompt only. Verify contractual notice, Hold/Witness point, release evidence and authority in project documents; this template assigns none. [Fill: Assigned performer, reviewer and external control roles]
- Record
- Pavement work-front survey and interface record
- Project document reference
- For this row, record the exact project document/revision/clause, drawing/sheet/detail or product instruction supporting: Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules. Identify missing or conflicting sources for disposition. Topic references do not establish project adoption.
- Project inputs to resolve
- Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules
- Blank record fields
- Chainage / lane / work front; Control / set-out ref.; Drainage / utility / structure interface; Permit / staging record ref.
ROA-03 · Material source, mix/design submissions and delivery traceability
- Work stage
- Material source, mix/design submissions and delivery traceability
- Inspection / test
- Confirm required material/product source approvals and project-specific design/submittal records are accepted before use.
- Method
- Reconcile source approval, mix/design submissions, delivery tickets and stockpile/lot identification with contract documents.
- Acceptance condition
- Project source and approved installation details identify the applicable scope, requirements and evidence for this location; record any gap or variance for assigned disposition. [Fill: Assigned performer, reviewer and external control roles] [Fill: Project inspection/testing plan and acceptance basis] [Fill: Project records and handover submission rules]
- Timing / coverage
- At the work stage identified by the project inspection plan; repeat when the applicable location, installation condition or controlled source changes. [Fill: Project inspection/testing plan and acceptance basis]
- Responsible role
- Proposed: assigned trade supervisor / quality role records the check; review and external sign-off remain with project-assigned persons acting within documented authority. [Fill: Assigned performer, reviewer and external control roles]
- Control / release arrangement
- Proposed internal readiness prompt only. Verify contractual notice, Hold/Witness point, release evidence and authority in project documents; this template assigns none. [Fill: Assigned performer, reviewer and external control roles]
- Record
- Roadworks materials approval and traceability register
- Project document reference
- For this row, record the exact project document/revision/clause, drawing/sheet/detail or product instruction supporting: Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules. Identify missing or conflicting sources for disposition. Topic references do not establish project adoption.
- Project inputs to resolve
- Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules
- Blank record fields
- Layer / material type; Quarry / supplier / source ref.; Mix / design approval ref.; Delivery / material lot locator
ROA-04 · Formation and subgrade release
- Work stage
- Formation and subgrade release
- Inspection / test
- Inspect formation/subgrade handover, geometry and specified evidence before the next pavement layer is placed.
- Method
- Review earthworks/subgrade records and any required geotechnical/survey dispositions against the contract-defined acceptance and release process.
- Acceptance condition
- Project source and approved installation details identify the applicable scope, requirements and evidence for this location; record any gap or variance for assigned disposition. [Fill: Assigned performer, reviewer and external control roles] [Fill: Project inspection/testing plan and acceptance basis] [Fill: Project records and handover submission rules]
- Timing / coverage
- At the work stage identified by the project inspection plan; repeat when the applicable location, installation condition or controlled source changes. [Fill: Project inspection/testing plan and acceptance basis]
- Responsible role
- Proposed: assigned trade supervisor / quality role records the check; review and external sign-off remain with project-assigned persons acting within documented authority. [Fill: Assigned performer, reviewer and external control roles]
- Control / release arrangement
- Proposed internal readiness prompt only. Verify contractual notice, Hold/Witness point, release evidence and authority in project documents; this template assigns none. [Fill: Assigned performer, reviewer and external control roles]
- Record
- Formation and subgrade release dossier
- Project document reference
- For this row, record the exact project document/revision/clause, drawing/sheet/detail or product instruction supporting: Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules. Identify missing or conflicting sources for disposition. Topic references do not establish project adoption.
- Project inputs to resolve
- Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules
- Blank record fields
- Chainage / lane / lot; Formation / subgrade criteria locator; Project report / test ref.; Assigned review / release evidence
ROA-05 · Unbound layer placement and interface
- Work stage
- Unbound layer placement and interface
- Inspection / test
- Record layer identity, source, work limits, placement/compaction method and interfaces for the specified granular pavement activity.
- Method
- Inspect the work front and compare records against the adopted project specification, approved construction procedure and material submittal.
- Acceptance condition
- Project source and approved installation details identify the applicable scope, requirements and evidence for this location; record any gap or variance for assigned disposition. [Fill: Assigned performer, reviewer and external control roles] [Fill: Project inspection/testing plan and acceptance basis] [Fill: Project records and handover submission rules]
- Timing / coverage
- At the work stage identified by the project inspection plan; repeat when the applicable location, installation condition or controlled source changes. [Fill: Project inspection/testing plan and acceptance basis]
- Responsible role
- Proposed: assigned trade supervisor / quality role records the check; review and external sign-off remain with project-assigned persons acting within documented authority. [Fill: Assigned performer, reviewer and external control roles]
- Control / release arrangement
- Proposed internal readiness prompt only. Verify contractual notice, Hold/Witness point, release evidence and authority in project documents; this template assigns none. [Fill: Assigned performer, reviewer and external control roles]
- Record
- Unbound pavement layer placement record
- Project document reference
- For this row, record the exact project document/revision/clause, drawing/sheet/detail or product instruction supporting: Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules. Identify missing or conflicting sources for disposition. Topic references do not establish project adoption.
- Project inputs to resolve
- Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules
- Blank record fields
- Base / subbase layer ID; Chainage / lane / lot; Material source / delivery refs.; Approved method / clause locator
ROA-06 · Project-specified pavement tests and report reconciliation
- Work stage
- Project-specified pavement tests and report reconciliation
- Inspection / test
- Check project-defined test plan coverage and reconcile issued results to layer, lot and work-front identities.
- Method
- Compare report identifiers, locations, method, criterion source, disposition and retests with contract annexures and the approved ITP.
- Acceptance condition
- Project source and approved installation details identify the applicable scope, requirements and evidence for this location; record any gap or variance for assigned disposition. [Fill: Assigned performer, reviewer and external control roles] [Fill: Project inspection/testing plan and acceptance basis] [Fill: Project records and handover submission rules]
- Timing / coverage
- At the work stage identified by the project inspection plan; repeat when the applicable location, installation condition or controlled source changes. [Fill: Project inspection/testing plan and acceptance basis]
- Responsible role
- Proposed: assigned trade supervisor / quality role records the check; review and external sign-off remain with project-assigned persons acting within documented authority. [Fill: Assigned performer, reviewer and external control roles]
- Control / release arrangement
- Proposed internal readiness prompt only. Verify contractual notice, Hold/Witness point, release evidence and authority in project documents; this template assigns none. [Fill: Assigned performer, reviewer and external control roles]
- Record
- Pavement testing and results register
- Project document reference
- For this row, record the exact project document/revision/clause, drawing/sheet/detail or product instruction supporting: Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules. Identify missing or conflicting sources for disposition. Topic references do not establish project adoption.
- Project inputs to resolve
- Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules
- Blank record fields
- Layer / work activity; Contract lot / chainage; Test method / clause; Report / result / disposition ref.
ROA-07 · Asphalt or specified surfacing interface
- Work stage
- Asphalt or specified surfacing interface
- Inspection / test
- Where asphalt or another surfacing is selected, verify plant/delivery/work-front records and surface interface evidence required by the adopted contract.
- Method
- Review the selected surfacing specification, annexure, delivery/mix records, joints/interface records and any specified trial or conformity documents.
- Acceptance condition
- Project source and approved installation details identify the applicable scope, requirements and evidence for this location; record any gap or variance for assigned disposition. [Fill: Assigned performer, reviewer and external control roles] [Fill: Project inspection/testing plan and acceptance basis] [Fill: Project records and handover submission rules]
- Timing / coverage
- At the work stage identified by the project inspection plan; repeat when the applicable location, installation condition or controlled source changes. [Fill: Project inspection/testing plan and acceptance basis]
- Responsible role
- Proposed: assigned trade supervisor / quality role records the check; review and external sign-off remain with project-assigned persons acting within documented authority. [Fill: Assigned performer, reviewer and external control roles]
- Control / release arrangement
- Proposed internal readiness prompt only. Verify contractual notice, Hold/Witness point, release evidence and authority in project documents; this template assigns none. [Fill: Assigned performer, reviewer and external control roles]
- Record
- Surfacing work-front and conformity record
- Project document reference
- For this row, record the exact project document/revision/clause, drawing/sheet/detail or product instruction supporting: Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules. Identify missing or conflicting sources for disposition. Topic references do not establish project adoption.
- Project inputs to resolve
- Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules
- Blank record fields
- Surfacing system / contract item; Chainage / lane / lot; Mix / delivery / plant records; Trial / conformity / defect report ref.
ROA-08 · Conformance survey and as-constructed geometry
- Work stage
- Conformance survey and as-constructed geometry
- Inspection / test
- Reconcile required survey/as-constructed records for the included pavement layers and final surface.
- Method
- Compare survey report identity, coordinate/datum, chainage coverage and contract-required geometry items against approved drawings and survey plan.
- Acceptance condition
- Project source and approved installation details identify the applicable scope, requirements and evidence for this location; record any gap or variance for assigned disposition. [Fill: Assigned performer, reviewer and external control roles] [Fill: Project inspection/testing plan and acceptance basis] [Fill: Project records and handover submission rules]
- Timing / coverage
- At the work stage identified by the project inspection plan; repeat when the applicable location, installation condition or controlled source changes. [Fill: Project inspection/testing plan and acceptance basis]
- Responsible role
- Proposed: assigned trade supervisor / quality role records the check; review and external sign-off remain with project-assigned persons acting within documented authority. [Fill: Assigned performer, reviewer and external control roles]
- Control / release arrangement
- Proposed internal readiness prompt only. Verify contractual notice, Hold/Witness point, release evidence and authority in project documents; this template assigns none. [Fill: Assigned performer, reviewer and external control roles]
- Record
- Pavement conformance survey register
- Project document reference
- For this row, record the exact project document/revision/clause, drawing/sheet/detail or product instruction supporting: Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules. Identify missing or conflicting sources for disposition. Topic references do not establish project adoption.
- Project inputs to resolve
- Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules
- Blank record fields
- Layer / final surface; Chainage / lane / limits; Survey file / report ref.; Datum / criteria locator
ROA-09 · Defects, lot disposition and roadworks closeout
- Work stage
- Defects, lot disposition and roadworks closeout
- Inspection / test
- Close the pavement evidence pack by tracking nonconformances, accepted dispositions, test/survey reports and contractual submission.
- Method
- Reconcile each lot/work front to records and submission requirements; preserve unresolved defects and approval interfaces as open.
- Acceptance condition
- Project source and approved installation details identify the applicable scope, requirements and evidence for this location; record any gap or variance for assigned disposition. [Fill: Assigned performer, reviewer and external control roles] [Fill: Project inspection/testing plan and acceptance basis] [Fill: Project records and handover submission rules]
- Timing / coverage
- At the work stage identified by the project inspection plan; repeat when the applicable location, installation condition or controlled source changes. [Fill: Project inspection/testing plan and acceptance basis]
- Responsible role
- Proposed: assigned trade supervisor / quality role records the check; review and external sign-off remain with project-assigned persons acting within documented authority. [Fill: Assigned performer, reviewer and external control roles]
- Control / release arrangement
- Proposed internal readiness prompt only. Verify contractual notice, Hold/Witness point, release evidence and authority in project documents; this template assigns none. [Fill: Assigned performer, reviewer and external control roles]
- Record
- Road pavement lot closeout and handover index
- Project document reference
- For this row, record the exact project document/revision/clause, drawing/sheet/detail or product instruction supporting: Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules. Identify missing or conflicting sources for disposition. Topic references do not establish project adoption.
- Project inputs to resolve
- Assigned performer, reviewer and external control roles; Project inspection/testing plan and acceptance basis; Project records and handover submission rules
- Blank record fields
- Chainage / lot / layer; NCR / disposition refs.; Test / survey report index; Submission / recipient / status ref.
Source notes
- Queensland TMR, MRTS04 General Earthworks (March 2025)
Queensland transport specification example for staged evidence only. It is not nationwide/default contract criteria; no numerical requirement is copied.
Official TMR PDF and official current-version index reviewed. PDF title/scope and clauses on earthworks, geometry, tests/records and schedule-controlled requirements inspected; Queensland document only.
- Queensland TMR, MRTS05 Unbound Pavements (July 2022)
Evidence-interface example only. No TMR lot sizes or frequencies are carried into this generic resource.
Official index and July 2022 MRTS05 PDF inspected. The specification identifies pavement construction, material traceability, construction procedure and contract-specific testing; Appendix A expressly labels defaults for typical TMR projects and permits project-specific frequencies through annexure.
- TfNSW, R116 Heavy Duty Dense Graded Asphalt (document page via official standards portal)
NSW-specific transport contract example; supports evidence traceability only.
Official portal document record and quality guide identify asphalt conformity evidence examples (mix design, binder conformity, trial section and records). Full document clauses not applied as generic requirements.
- Construction Quality Australia, How to create an Inspection and Test Plan (ITP)
Structure and record-design guidance only. It does not create project criteria, jurisdictional rules or control points.
Public industry guide; sections on sequencing activities, method, acceptance source, responsibility, control points and records. Reviewed 2026-10-07.
Connect the plan to field evidence
- Construction Nonconformance Report and Corrective Action Record
- Construction ITP Inspection and Quality Records Register
Prepare this package and its inspection records · Choose a scoped trade template
Need your road pavement construction ITP prepared for this project?
Send your drawings, specifications and contractor requirements. Receive a project-specific ITP and matching blank site records in Excel, Word and PDF.
USD 99 per defined work package · Within 24 hours after payment and the required project files are complete.