Concrete
From pre-pour checks and concrete delivery to curing, strength reports and final inspection.
Start Concrete editorChoose the trade that best matches your work package to open its editor. Select relevant inspection steps, add project references and export the plan in Excel, Word or PDF.
From pre-pour checks and concrete delivery to curing, strength reports and final inspection.
Start Concrete editorMaterials, fabrication, welds, fasteners, coatings and erection. Select the work in your package.
Start Structural steel editorExcavation, founding, fill placement, compaction testing, trench backfill and final survey.
Start Earthworks & excavation editorInternal wet areas: substrate, junctions, membrane application, curing and pre-cover checks.
Start Wet-area waterproofing editorOrdinary low-voltage building work, with installation checks and blank verification records.
Start Electrical installation editorWater, sanitary and stormwater services, with separate test and pre-cover checks.
Start Plumbing & drainage editorA deliberately bounded interface baseline for a project-defined road pavement package from released formation/subgrade through unbound base/subbase and the specified surfacing interface, test evidence, survey and handover. Use only when the actual contract defines these activities and documents their criteria. It is not a national roadworks specification. Excludes drainage, bridges, pavement design, traffic management design, geotechnical design and unselected stabilisation or concrete pavement systems.
Start Road pavement construction editorBuilding automatic sprinkler distribution/range pipe installation only, based on an identified approved design and project-adopted system standard. Covers material/route/support/joint/penetration coordination and receipt/review of a project-required test report from the assigned testing/commissioning party. Excludes fire hydrants, hose reels, alarms/detection, pumpsets, special hazards, domestic-system design, head fit-off unless expressly shown, pressure/functional test instructions, commissioning execution and statutory certification.
Start Sprinkler pipe installation editorOrdinary building ductwork installation from approved layout through supports, duct assembly, insulation, terminal devices and handover of project-required inspection/test evidence. Excludes refrigeration circuits, refrigerant handling, equipment electrical work, system design, airflow balancing, test execution, commissioning, controls integration and building performance certification.
Start HVAC ductwork installation editorMetal roof sheet installation on a building roof, including scope/design release, material handling, support readiness, sheet installation, cut edges, flashings and weathering interface, closeout evidence. Excludes roof tiles/slate, roof drainage design/system, structural design, solar equipment, waterproofing membranes and specialist roof-access design.
Start Metal roofing installation editorOrdinary building decorative painting to scheduled interior/exterior building surfaces, including substrate review, preparation, approved primer/coating system, application, finish review, protection and handover. Excludes industrial/protective coating systems, specialist fireproofing, lead/asbestos remediation, structural repairs and coating design.
Start Architectural painting editorOrdinary internal ceramic/porcelain wall and floor tiling within a building, including substrate/readiness handoff, set-out, adhesive fixing, grout, movement/junction interfaces and closeout. Waterproofing design/installation/certification, stone, external facades, pools, structural substrate repair, wet-area compliance pathway selection and project-specific numerical tolerances are excluded or treated as interfaces.
Start Internal wall and floor tiling editorAn empty planning structure for a user-defined package. No trade inspection sequence is supplied. Replace the first placeholder row and add your own stages, methods, project criteria, roles and evidence links. Use a scoped trade template if you need candidate inspection coverage.
Start Blank ITP editorReusable editable baseline for conventional cast-in-place building slabs on ground and suspended floor slabs within one clearly identified project work package. Includes pre-pour substrate/interface coordination, set-out, formwork, reinforcement and embeds, concrete supply/placement/testing, finish, joints, curing, protection and records. Suspended slab-specific temporary works, post-tensioning, precast, toppings/screeds, industrial floors, pavements and specialist slabs require separate scope unless expressly included. Design, soil classification, mix criteria, tolerances, test rates, statutory duties and contractual Hold/Witness points are not supplied.
Start Concrete slab editorReusable editable baseline for cast-in-place building pad, strip and ground-beam footings within a defined package. Covers approved foundation/design basis, excavation handover, set-out, reinforcement/starters, formwork/embeds, pre-pour authorization, concrete delivery/testing, placement, curing, stripping/loading controls and closeout. Excludes piles, bored piers, underpinning, retaining structures, precast footings and ground improvement unless separately specified. No geotechnical acceptance, design values, excavation safety method, tolerances, test rates or release authority is supplied.
Start Concrete footings editorReusable editable baseline for cast-in-place reinforced concrete building columns and structural walls. Covers interface/starter verification, reinforcement and embeds, formwork/alignment, pre-pour review, supply and specified tests, vertical placement/consolidation, joints, curing/stripping, geometry, defects and records. Excludes precast, slipform/jumpform specialist design, post-tensioning, retaining/tank walls, shotcrete and architectural exposed-concrete mockups unless project-specific scope is added. No formwork engineering, concrete lift limits, tolerances, strength criteria, stripping time or release authority is supplied.
Start Concrete columns and walls editorShop material traceability, processing, fit-up, welding, specified inspection, coating interfaces and dispatch dossier.
Start Steel fabrication editorSite receiving, supports, approved stability documents, member connections, survey evidence and handover.
Start Steel erection editorBuilding water pipe identification, routing, joints, cross-connection interfaces, project-specified testing and handover.
Start Water services installation editorBuilding sanitary drainage routes, bedding, levels, joints, access, pre-cover testing and as-built evidence.
Start Sanitary drainage editorSite stormwater pipes, pits, levels, approved outlet interfaces, pre-cover checks and completion records.
Start Stormwater drainage editorSite cut and fill boundaries, survey control, excavation and formation, material movements and staged handover evidence.
Start Bulk earthworks editorFill source identity, prepared receiving surface, layer placement, conditioning, specified testing and failure/retest traceability.
Start Fill placement and compaction editorUtility trench formation, bedding and surround, service protection, staged backfill, testing and reinstatement handover.
Start Trench bedding and backfill editorLow-voltage building containment, cable routes, identification, concealed-work evidence and handover to termination and verification.
Start Electrical rough-in editorBoard identity and receiving evidence, mounting, circuit interfaces, installation checks and links to licensed verification and connection decisions.
Start Switchboard installation editorYour draft is saved in the current browser. It is a starting document and needs project review before use.
Send your drawings, specifications and contractor requirements. Receive a project-specific ITP and matching blank site records in Excel, Word and PDF.
USD 99 per defined work package · First delivery within 24 hours after payment and receipt of complete required project files. Weekends and public holidays included. Need it sooner? Contact us before ordering to confirm availability.
2 free revision rounds within 14 days of first delivery. Our errors are corrected free without using a round. Delivery, revisions and refunds.