Scope and limitations
Structural steel work may cover material identification, fabrication, welding, bolting, coating and erection. Confirm the contracted scope and required hold or witness points.
Enter project drawing and specification references and confirm inspection responsibilities with the project team. Technical criteria must come from the approved project documents.
Inspection steps in this starting template
- Planning and submittals — Confirm package boundaries, design documents, construction category, inspection/testing plan and fabrication/erection interfaces.
Review approved drawings, specification, annexures and submittal register.
- Material certificates and traceability — Verify section, plate, bolt and consumable identity and link supplied steel to certificates/heat or batch evidence.
Check markings, tags, delivery dockets and certificates against material register and approved grade schedule.
- Material condition and storage — Inspect received steel and consumables for damage, corrosion, distortion, contamination and protected storage.
Visual inspection on receipt and before use; check storage requirements for consumables.
- Fabrication set-out and cutting — Check member identity, cut lengths, hole positions, edge preparation and fabrication dimensions.
Measure against shop/approved drawings and fabrication schedule before assembly or welding.
- Welding documentation readiness — Verify approved welding procedures, weld map, consumables and personnel qualifications required by project.
Review WPS, procedure qualification evidence, welder qualifications/continuity and consumable records against weld schedule.
- Fit-up and joint preparation — Inspect joint preparation, root gap, alignment, cleanliness, backing and fit-up before welding.
Visual and dimensional checks against approved joint detail and applicable WPS.
- Welding process controls — Check weld execution records include joint identity, WPS, welder, date and any specified environmental/process controls.
Observe/record welding and review production logs against approved WPS and project requirements.
- Completed weld visual inspection — Inspect completed welds for profile, visible defects, size and completion against weld map and acceptance criteria.
Visual inspection by project-designated competent inspector; use measuring gauges where required.
- Specified NDT — Arrange and review only the NDT methods, extent and acceptance specified for the welds.
Match NDT request/report to joint IDs and weld map; verify method, operator, equipment and report disposition as required.
- Bolt and fastener receipt — Check bolt assemblies, grade, lot identity, coating/condition and required certificates.
Review packaging marks, certificates and delivery register against connection schedule and installation specification.
- Bolt installation and verification — Inspect connection assembly, fit, washer/nut arrangement and the project-specified installation/verification evidence.
Observe installation method and examine calibrated tool records or verification tests only where required by project.
- Protective coating surface preparation — Check substrate preparation, cleanliness, profile and environmental conditions before coating.
Inspect surface against specified coating system and record preparation method/environment; verify traceability before blasting/galvanizing where required.
- Coating application and thickness — Inspect applied coating system, coverage, dry film thickness or galvanizing checks as specified.
Review batch records and use specified inspection method/instrument; record calibration and measurement locations.
- Fabrication release and delivery — Compile material, dimensional, weld, NDT and coating records; inspect member markings and transport condition.
Review manufacturing data book against member register; inspect before dispatch and again on receipt.
- Erection and temporary stability — Check erection sequence, lifting/temporary bracing, member orientation, plumb/level and connection completion against approved erection documents.
Observe erection and survey critical geometry against approved drawings and temporary works/erection method.
- Grout, final connections and closeout — Inspect specified baseplate grout and final connection completion; close out defects and as-built records.
Check grout product, preparation/application records where required; verify final bolt/weld completion, survey and NCR closure.
How to complete the project fields
- Identify the actual work package and remove steps outside its scope.
- For each retained check, cite the current drawing, specification, product instruction or approved project document.
- Enter project acceptance requirements exactly from those sources and agree inspection responsibilities and release points.
- Keep measurements, observations, dates and signatures blank until checks are performed on site.
Source notes
The starting structure is a general planning aid. The links below explain topic context; they do not set universal project acceptance values.
- NSW Government Quality Management Guidelines for Construction, Appendix D (ITP guidance)
Limited methodology context only: the NSW public page identifies a construction ITP guideline/checklist resource and contract-level quality planning. The linked Appendix D document itself was not inspected, so no detailed template fields or technical acceptance rules are attributed to it.
- Queensland TMR MRTS78 Fabrication of Structural Steelwork (November 2020)
Inspected topic-specific technical example for Queensland transport/bridge steelwork. Use detailed criteria only if the project adopts this edition and contract documents; Section 12 includes installation and bolt tensioning, not just fasteners. It does not establish general building values.
- Hutchinson Builders, Construction ITPs and Reports suite (downloadable Word examples)
Australian builder industry examples support high-level task sequencing, separate groundworks/concrete/steel process stages, records and lot/report fields only. Examples are explicitly marked EXAMPLE; they are not standards and provide no universal acceptance values or test rates. Original templates are not redistributed or copied.