Project-specific drafting

Project-specific HVAC and mechanical ITP preparation

Send the package scope, mechanical drawings and schedules, equipment and controls interfaces, specifications and contractor form. We organise the documented stages and preserve links to evidence from assigned test and commissioning parties.

USD 99 per defined work package · Excel, Word and PDF · Within 24 hours after payment and the required project files are complete and usable

The work package we prepare

One customer-defined HVAC or mechanical services package from controlled project documents. The public starting point is ordinary building ductwork; the paid plan may cover other documented equipment, pipework, controls, balancing and commissioning interfaces, with each check and evidence owner tied to its source.

The public baseline covers ordinary building ductwork only. Paid scope follows the supplied project criteria for the agreed package. We do not design, install, handle refrigerants, perform tests or balancing, commission equipment, integrate controls or certify building performance; those activities stay with assigned specialists.

Documents that make the plan specific

Upload the files as they are. You do not need to extract clauses or rewrite them into a brief. Include the mandatory contractor form if you have one.

Mechanical drawings, schedules and equipment data
Identify systems, areas, routes, equipment, terminals, controls points and approved revisions.
Specifications and approved system documents
Provide project requirements for construction, supports, insulation, equipment installation, controls and identification with source revisions.
Controls, balancing and trade interface documents
Include BMS/control sequences, electrical interfaces, access, fire/smoke interfaces and responsibilities wherever in the package.
Test, commissioning and contractor form requirements
State required evidence, who performs and reports it, applicable acceptance source, coverage, defects/retest and review roles.

How requirements become checks and records

The sequence below explains the document workflow. It contains no engineering thresholds or completed inspection results.

Work stageWhat the ITP resolvesWhat the blank record captures later
Equipment/material receipt and installation readinessMap system/asset IDs and source-defined product/support requirements to receiving and prerequisite checks.Capture system, location, equipment/product references, prerequisite handover and source revision.
Installation, connections and controls interfacesTie documented installation and controls requirements to their actual discipline and area interfaces.Record area/system, specified checks, interface status, observations, defects and linked evidence.
Test, balancing/commissioning evidence and handoverIndex project-required reports from the assigned specialist against the named system and source criteria.Capture report IDs/revisions, stated coverage, outstanding defects, retest links and handover status.

What you receive

If the documents are incomplete or conflict

For example, a duct layout can define a route while equipment/control documents, project test criteria or evidence ownership are missing. We flag the missing source and do not invent leakage limits, support spacing, airflow values or commissioning results.

Project document precedence and approved revisions control the plan. Drafting does not confer engineering approval, certify compliance or guarantee contractor acceptance.

Related free records and guides

Start with your actual scope

Tell us the element, room group, work area or package boundary and upload the drawings, specification, product documents and required form as available. Questions can go to itp@cavoren.net.

Prepare my HVAC & mechanical services ITP