Construction planning guide

Concrete Kerb and Footpath ITP: Subgrade, Joints, Finish and Records

Kerbs and footpaths need their own inspection sequence because their line, levels, joints, surface finish and interfaces are recorded along narrow runs and discrete panels. Identify each segment and joint layout before concrete placement.

Scope of this guide

For minor cast-in-place concrete works such as kerb and gutter, crossings, footpaths, driveways and paving. The reference is ACT Government Specification SS06 Section 6, a jurisdiction-specific roadworks source. Its project values, tolerances, test frequencies and Hold Point apply only where adopted. Structural slabs, buildings and major concrete are outside scope.

Define segment limits and project controls

SS06 Section 6 separates earthworks, grading, subbase, formwork, finishing, joints, curing/protection, making good, conformance and testing. Use that as a source-specific workflow and break a long run into project-defined lots or pour segments with a consistent location key.

Before work, confirm approved cross-sections and levels, service and kerb interfaces, joint plan, concrete and reinforcement requirements, access controls, test plan and adopted inspection notices.

InputWhat the plan needs
Alignment and geometryApproved line, levels, crossfall, transitions, crossing types, drainage interfaces and segment extents.
Ground and substrateSubgrade and subbase source, preparation, test evidence, release status and locations.
Formwork and reinforcementForm / slip-form method, reinforcement only where specified, cast-in items and associated evidence.
Concrete and finishSpecified mix, supply evidence, sampling/testing plan, finish type and curing/protection method.
Joints and interfacesApproved joint drawing/schedule, existing structures, adjacent pavement and utility/kerb markers.
Conformance / closeoutApplicable criteria, test/report routing, defective-work process, reinstatement and as-built survey.

Inspect in a sequence that preserves access

Keep pre-pour checks separate from finishing and final conformity. For each segment, record the drawing source and actual evidence while the feature can still be seen.

StagePlan check and source locatorRecord evidence
Set-outSegment chainage/grid, line/level and cross-section from approved drawings.Survey or set-out record, segment limits, any unresolved level/interface.
Subgrade and subbaseProject-defined preparation, material, testing and release requirements.Test report and lot references, observed condition, level evidence, release reference where required.
Formwork and reinforcementProfile, edge restraint, reinforcement/cast-ins where specified and approved detail.Form/line/level check, reinforcement or embed record, photos before concealment if required.
Pre-pour readinessProject-specified notice, cleanliness, joint materials, concrete supply and approved sequence.Checklist/inspection record, required notices and response, mix and delivery plan, open items.
Placement and finishPlacement/compaction method, crossfall/profile, texture and edge treatment from contract.Docket/sample references, event time, segment, observed finish, joint locations and any interruption.
Curing and protectionSpecified curing method, duration and protection conditions.Product/application or alternative method, time and area, damage/weather event, repair/recheck.
Final and making goodLevels, alignment, surface defects, interfaces, service reinstatement and required testing.Survey/test records, defect/NCR, repair and recheck, as-built reference and authorised closeout.

Blank kerb or footpath event record

Use a separate record for each work segment or a controlled form that preserves segment and pour identification. Leave results and signatures blank until the event.

Field groupBlank fields
ControlProject: ___ Road / path / crossing: ___ Segment / lot: ___ Date / shift: ___ Record ID / revision: ___
GeometryDrawing / revision / section: ___ Chainage start/end: ___ Side / segment type: ___ Set-out record: ___
SubstrateSubgrade/subbase source and lot: ___ Test report IDs: ___ Surface/level observation: ___ Release/query: ___
Pre-pourForms/profile: ___ Reinforcement/embeds if specified: ___ Joint layout/material: ___ Inspection/notice reference: ___
ConcreteApproved mix reference: ___ Docket/batch: ___ Sample/test IDs if required: ___ Placement start/finish: ___
Finish and jointsSurface finish: ___ Joint type/location: ___ Measured values only where required: ___ Observation/photo: ___
Curing / protectionMethod/product: ___ Start/time/area: ___ Protection and damage observation: ___ Repair reference: ___
CloseoutSurvey/as-built: ___ NCR/defect: ___ Repair/recheck: ___ Outstanding test/record: ___ Authorised disposition: ___

Resolve missing project criteria before work

For a missing crossfall, joint, mix, frequency or release condition, cite the exact missing document and raise a project query before the affected work proceeds.

Fictional workflow: close one footpath segment

Fictional segment ID and records illustrate one footpath evidence trail.

  1. Set a fictional segment ID from the project chainage limits and approved cross-section.
  2. Link the actual substrate report and set-out record before creating the pre-pour event.
  3. Record forms, specified reinforcement and joint positions while visible; retain any required release record.
  4. Attach delivery and sample identifiers to the actual placement and finish record.
  5. Link curing/protection, survey, defects and authorised disposition before segment closeout.

Before issuing the plan

Sources and project references

Related resources

Continue with the related work

Choose the next resource for your task.

Prepare this work package

Map the selected system and controlled sources into the project form.

Record observations and follow-up

Keep actual event evidence, discrepancies and release decisions traceable.

Check related scopes

Use these resources for the stated interfaces, rather than assuming one baseline covers every system.

Browse guides by task · Browse field and quality records

Need this turned into a project-specific ITP?

Send the drawings, specifications, contract control-point requirements and required form. We prepare the scoped ITP and matching blank records, with source references and open confirmations.

USD 99 per defined work package · Excel, Word and PDF · First delivery within 24 hours after payment and receipt of complete required project files. Weekends and public holidays included. Need it sooner? Contact us before ordering to confirm availability.

2 free revision rounds within 14 days of first delivery. Our errors are corrected free without using a round. Delivery, revisions and refunds.